19
Section 10: COMMISSIONING THE APPLIANCE
Turn on and test the gas supply up to the fire for any leaks, in accordance with current
Approved Codes of Practice (ACO
Section 10.1: OPERATING THE APPLIANCE
See Section 12 Users Instructions page **
Section 10.3: SPARK FAILURE
The gap between the spark electrode and the pilot should be 3.5 - 4.5mm to produce a good
spark. There should be no need to adjust this.
If under any circumstances the electric spark fails, the pilot may be lit manually by
proceeding with the ignition sequence as previously described, and after turning the control
knob through the spark position, the knob should be held in and the pilot lit with a taper.
SECTION 11: SETTING PRESSURE
Remove the pressure test point sealing screw from the isolation elbow and attach a suitable pressure
gauge.
Check that the standing inlet gas pressure is at 20 mbar
Light the pilot and check the correct operation of the
burner at all the flame settings.
Refer to the Operating instructions section 10.1
Check that the inlet gas pressure is at 20 mbar when the
fire is at its highest setting.
Once the fire has been lit for 5 minutes, turn the gas OFF
at the isolating elbow.
After a further 3 minutes turn the gas supply ON again, if
the gas has stopped flowing, the Flame
Supervision Device (FSD) is operating correctly.
Always check that the gas has stopped flowing even if you
hear the FSD valve close within the 3-minute period.
Turn OFF the appliance and the gas supply and refit the
pressure test point sealing screw.
Содержание Royal Solo Apex
Страница 38: ...38 SECTION 20 LIST OF SPARES Royal 600 Manual Controls C1 C 4 C2 C3 B1 ...
Страница 39: ...39 SECTION 20 LIST OF SPARES Royal 1000 Manual Controls A5 A6 A4 A7 C1 C 4 C2 C3 B1 ...
Страница 40: ...40 Royal 400 Remote Control A5 A6 A4 A7 C1 C 4 C2 C3 ...
Страница 41: ...41 Royal 600 Remote Control A2 A3 A4 A1 A2 A3 A1 A4 ...
Страница 42: ...42 Royal 1000 Remote Control 5E 2E 3E 4E 6E 13E 10E 12E 7E 11E A1 A2 A3 A4 ...
Страница 43: ...43 Royal 400 Ceramics Royal 600 Ceramics Royal 1000 Ceramics F1 F3 F5 ...