SIQENS Ecoport 800
Operation
Page 27 of 48
5.1.
Quickstart
1. Connect the QE Charge methanol cartridge or tank
Connect the QE Charge methanol cartridge or the
external tank to the methanol supply line (1.5 m)
of the Ecoport.
Use the enclosed barrel wrench to open and
close the cartridge.
For a detailed description, see
DANGER
Please observe the safety instructions for handling methanol
NOTICE
Do not position the QE Charge methanol cartridge or external tank above the level
of the Ecoport. Place the cartridge or tank with the opening facing upwards.
2. Connect the battery
Insert the battery cable into the battery plug of
the Ecoport.
The red contact of the battery cable must be
connected to the positive pole (+) of the battery.
The black contact of the battery cable must be
connected to the negative pole (-) of the battery.
As soon as a voltage is present, the fans of the
Ecoport start a function check.
For a detailed description, see
NOTICE
Pay attention to the polarity when connecting the cables
Besides the Ecoport, other energy sources, for example photovoltaic and wind, can
be connected to the same battery