SYSTEM OPERATIONS-85
SEAKEY
The SeaKey Satellite Communication Sys-
tem is installed on your yacht at the fac-
tory. It is comprised of the following items:
High Water Alarm Switch
SatCom Sending Unit
Display Control Unit
Your SeaKey System always has battery
power to it. This is a major advantage over
the VHF Radio, which may be accidentally
turned off.
HIGH WATER ALARM SWITCH
Please be advised that the switch is only
in the mid compartment. Other compart-
ments could
fl
ood
fi
rst and the switch
would not be activated. The switch will
only be activated when the normal operat-
ing bilge pumps have failed and cannot
handle the incoming water
fl
ow.
SatCom Sending Unit
The SatCom Sending Unit is installed
inside the console on your yacht. This unit
sends out a low frequency signal to the
satellite, which in turn sends the signal
to the receiving location. You must know
the location of the Sending Unit. If anyone
is standing in front of the Sending Unit,
they could block the signal from going to
the satellite. Refer to the SeaKey Owners
Guide for more information.
DISPLAY CONTROL PANEL
The Control Panel has many functions.
Refer to the SeaKey Owners Guide to un-
derstand all the important features of the
control panel.
Your SeaKey system draws its’ power
from the batteries in your yacht. If the
batteries go dead, or if the batteries are
removed from the system, the system will
send a signal to the receiving station. Be-
fore removing power from your system we
recommend contacting SeaKey Member
Services for the proper procedures.
Содержание 45 convertible
Страница 1: ......
Страница 6: ...INTRODUCTION 6...
Страница 8: ...INTRODUCTION 8...
Страница 12: ...INTRODUCTION 12...
Страница 25: ...GETTING FAMILIAR 5 DECK...
Страница 28: ...GETTING FAMILIAR 8...
Страница 32: ...GETTING FAMILIAR 12...
Страница 42: ...GETTING FAMILIAR 22...
Страница 60: ...SAFETY 18...
Страница 64: ...SYSTEM OPERATIONS 4...
Страница 68: ...SYSTEM OPERATIONS 8...
Страница 70: ...SYSTEM OPERATIONS 10...
Страница 72: ...SYSTEM OPERATIONS 12...
Страница 78: ...SYSTEM OPERATIONS 18...
Страница 80: ...SYSTEM OPERATIONS 20...
Страница 84: ...SYSTEM OPERATIONS 24...
Страница 94: ...SYSTEM OPERATIONS 34...
Страница 98: ...SYSTEM OPERATIONS 38...
Страница 100: ...SYSTEM OPERATIONS 40...
Страница 108: ...SYSTEM OPERATIONS 48...
Страница 116: ...SYSTEM OPERATIONS 56...
Страница 120: ...SYSTEM OPERATIONS 60...
Страница 124: ...SYSTEM OPERATIONS 64...
Страница 134: ...SYSTEM OPERATIONS 74...
Страница 140: ...SYSTEM OPERATIONS 80...
Страница 144: ...SYSTEM OPERATIONS 84...
Страница 146: ...SYSTEM OPERATIONS 86...
Страница 160: ...OPERATION 6...
Страница 168: ...GLOSSARY 6...
Страница 170: ...GLOSSARY 8...
Страница 171: ...GLOSSARY 9 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Страница 172: ...GLOSSARY 10 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Страница 174: ...GLOSSARY 12...
Страница 180: ...GLOSSARY 18...
Страница 183: ......
Страница 184: ......
Страница 186: ......
Страница 187: ...WIRE CHART WIRE CHART...
Страница 188: ......
Страница 189: ...PLUG H TO HELM SWITCH PANEL...
Страница 190: ...WIRE CHART CAP TT TO HELM SWITCH PANEL CAP J TO HELM BREAKER PANEL CAP E TO HELM SWITCH PANEL...
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ......
Страница 195: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ...WIRE CHART WIRE CHART...
Страница 201: ...WIRE CHART WIRE CHART...
Страница 203: ...PLUG A TO HELM SWITCH PANEL PLUG F TO HELM SWITCH PANEL PLUG J TO BRIDGE JUMP HARNESS...
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ...45 Convertible FLOOR PLAN...
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ......
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......
Страница 221: ......
Страница 222: ......
Страница 223: ......
Страница 225: ......
Страница 226: ...45 CONVERTIBLE WASTE...