SYSTEM OPERATIONS-23
BATTERY SYSTEM
The batteries located in the Engine Compart-
ment are 12 volt batteries wired in series to
give 24 volt service. The “Battery 1” Battery
Switch located at the Battery Switch Panel
in the salon is fed from the port batteries.
The “Battery 2” Battery Switch is fed from
the starboard batteries.
The battery system is charged thru alterna-
tors of the engines.
The port & starboard battery banks may be
paralleled thru the parallel start switch at
the helm.
The generator Start is thru the starboard
bank of batteries.
The photo below shows the Starboard Bat-
tery Bank.
BATTERY CHARGERS: Located above the
Batteries on each side of the engine room
are the battery Charges. The chargers have
an AC input from your 120 volt supply, and
a 24 volt output.
Refer to the Battery Chargers Owner’s
Manual for operation of these chargers.
Batteries also get charged from the en-
gines when they are running.
Содержание 45 convertible
Страница 1: ......
Страница 6: ...INTRODUCTION 6...
Страница 8: ...INTRODUCTION 8...
Страница 12: ...INTRODUCTION 12...
Страница 25: ...GETTING FAMILIAR 5 DECK...
Страница 28: ...GETTING FAMILIAR 8...
Страница 32: ...GETTING FAMILIAR 12...
Страница 42: ...GETTING FAMILIAR 22...
Страница 60: ...SAFETY 18...
Страница 64: ...SYSTEM OPERATIONS 4...
Страница 68: ...SYSTEM OPERATIONS 8...
Страница 70: ...SYSTEM OPERATIONS 10...
Страница 72: ...SYSTEM OPERATIONS 12...
Страница 78: ...SYSTEM OPERATIONS 18...
Страница 80: ...SYSTEM OPERATIONS 20...
Страница 84: ...SYSTEM OPERATIONS 24...
Страница 94: ...SYSTEM OPERATIONS 34...
Страница 98: ...SYSTEM OPERATIONS 38...
Страница 100: ...SYSTEM OPERATIONS 40...
Страница 108: ...SYSTEM OPERATIONS 48...
Страница 116: ...SYSTEM OPERATIONS 56...
Страница 120: ...SYSTEM OPERATIONS 60...
Страница 124: ...SYSTEM OPERATIONS 64...
Страница 134: ...SYSTEM OPERATIONS 74...
Страница 140: ...SYSTEM OPERATIONS 80...
Страница 144: ...SYSTEM OPERATIONS 84...
Страница 146: ...SYSTEM OPERATIONS 86...
Страница 160: ...OPERATION 6...
Страница 168: ...GLOSSARY 6...
Страница 170: ...GLOSSARY 8...
Страница 171: ...GLOSSARY 9 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Страница 172: ...GLOSSARY 10 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Страница 174: ...GLOSSARY 12...
Страница 180: ...GLOSSARY 18...
Страница 183: ......
Страница 184: ......
Страница 186: ......
Страница 187: ...WIRE CHART WIRE CHART...
Страница 188: ......
Страница 189: ...PLUG H TO HELM SWITCH PANEL...
Страница 190: ...WIRE CHART CAP TT TO HELM SWITCH PANEL CAP J TO HELM BREAKER PANEL CAP E TO HELM SWITCH PANEL...
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ......
Страница 195: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ...WIRE CHART WIRE CHART...
Страница 201: ...WIRE CHART WIRE CHART...
Страница 203: ...PLUG A TO HELM SWITCH PANEL PLUG F TO HELM SWITCH PANEL PLUG J TO BRIDGE JUMP HARNESS...
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ...45 Convertible FLOOR PLAN...
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ......
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......
Страница 221: ......
Страница 222: ......
Страница 223: ......
Страница 225: ......
Страница 226: ...45 CONVERTIBLE WASTE...