Installation
5.2 Preparing for installation
1LE7 shaft heights 71 ... 315
44
Operating Instructions, 04/2022, A5E51689275A-AA
5.2
Preparing for installation
5.2.1
Requirements for installation
The following requirements must be satisfied prior to starting installation work:
•
Staff have access to the operating and installation instructions.
•
The motor is unpacked and ready for mounting at the installation location.
•
Measure the insulation resistance of the winding before starting any installation work. If
the insulation resistance lies below the specified value, take appropriate remedial
measures. These remedial measures may necessitate the motor being removed again and
transported.
Note
Note also the technical data on the rating plates on the motor enclosure.
NOTICE
Damage to the motor
To avoid material damage, before commissioning, check whether the correct direction of
rotation of the motor has been set on the customer side, e.g. by decoupling from the driven
load.
Damage to mounted parts and components as a result of high temperatures
The motor components get very hot during operation. High temperatures can damage parts
mounted by customers, such as cables manufactured out of materials that are not heat
resistant.
•
Temperature-sensitive parts must not come into contact with or be attached to
components mounted on the motor.
•
Only use heat-resistant mounting parts. The connecting cables and cable entries must be
suitable for the particular application.
Содержание SIMOTICS SD SH 71 315 Series
Страница 2: ......
Страница 10: ...Table of contents 1LE7 shaft heights 71 315 8 Operating Instructions 04 2022 A5E51689275A AA ...
Страница 26: ...Description 3 3 Installation 1LE7 shaft heights 71 315 24 Operating Instructions 04 2022 A5E51689275A AA ...
Страница 114: ...Spare parts 10 2 Exploded drawings 1LE7 shaft heights 71 315 112 Operating Instructions 04 2022 A5E51689275A AA ...
Страница 118: ...Disposal 11 5 Disposal of components 1LE7 shaft heights 71 315 116 Operating Instructions 04 2022 A5E51689275A AA ...