①
Miniature circuit breaker
②
LAN interface
③
Connecting terminals for the trip signal (terminals 29 and 30)
④
Cable glands
⑤
Connecting terminal for PE of the power supply
⑥
Connecting terminals for L1 and N of the power supply at the rotary disconnection device
Precondition
• A feeder cable to the 1-phase AC supply:
TN or TT supply system according to VDE 0100 T 300 / IEC 364‑3, with rated voltage
120/230 V AC, 50/60 Hz
• A LAN cable for the connection to the IPC via a dedicated network is available.
• Ethernet connector (that is crimped on)
• Crimping tool
Connecting the power supply
1. Open the sensor box. For the UL version of the connectivity module, follow the instructions
provided in Chapter Only UL version: Opening and closing the sensor box door (Page 25).
2. Open the miniature circuit breaker
①
.
3. Route the power cable from below through the cable gland into the sensor box.
Connection
6.2 Connecting the sensor box
28
Operating Instructions, 06/2020
Содержание SIMOTICS CONNECT 600
Страница 2: ......
Страница 8: ...Introduction 1 2 Naming convention 6 Operating Instructions 06 2020 ...
Страница 14: ...Safety instructions 2 6 Security recommendations 12 Operating Instructions 06 2020 ...
Страница 34: ...Connection 6 3 Connecting the IPC 32 Operating Instructions 06 2020 ...
Страница 42: ...Operation 8 1 Data evaluation with SIDRIVE IQ 40 Operating Instructions 06 2020 ...
Страница 62: ...Maintenance 9 11 Deleting the data of the connectivity module 60 Operating Instructions 06 2020 ...
Страница 66: ...Replacement parts 10 2 Replacement parts for the connectivity module 64 Operating Instructions 06 2020 ...
Страница 70: ...Disposal 11 4 Information according to Article 33 of the REACH regulation 68 Operating Instructions 06 2020 ...
Страница 72: ...Service support A 1 Product support 70 Operating Instructions 06 2020 ...
Страница 76: ...Known problems C 1 Known problems of the current software version 74 Operating Instructions 06 2020 ...
Страница 79: ......