9. Connect the power cable to the following terminals as shown in the terminal diagram.
– CE version: L1, N and PE at terminals
⑨
– UL version: L1 and N at the rotary disconnection device
⑩
, PE at terminal
⑨
10.Connect all of the cables at the terminal block
⑧
as shown in the terminal diagram.
11.Tighten the cable glands
⑤
correctly so that the degree of protection of the connectivity
module is guaranteed.
12.Attach the shield connection clamp to the terminal block
⑧
. Carefully ensure that all of the
cables are not strained.
13.Close the miniature circuit breaker
①
.
14.Close the sensor box door. For the UL version of the connectivity module, follow the
instructions provided in Chapter Only UL version: Opening and closing the sensor box door
(Page 25).
Maintenance
9.7 Replacing connectivity module components
50
Operating Instructions, 06/2020
Содержание SIMOTICS CONNECT 600
Страница 2: ......
Страница 8: ...Introduction 1 2 Naming convention 6 Operating Instructions 06 2020 ...
Страница 14: ...Safety instructions 2 6 Security recommendations 12 Operating Instructions 06 2020 ...
Страница 34: ...Connection 6 3 Connecting the IPC 32 Operating Instructions 06 2020 ...
Страница 42: ...Operation 8 1 Data evaluation with SIDRIVE IQ 40 Operating Instructions 06 2020 ...
Страница 62: ...Maintenance 9 11 Deleting the data of the connectivity module 60 Operating Instructions 06 2020 ...
Страница 66: ...Replacement parts 10 2 Replacement parts for the connectivity module 64 Operating Instructions 06 2020 ...
Страница 70: ...Disposal 11 4 Information according to Article 33 of the REACH regulation 68 Operating Instructions 06 2020 ...
Страница 72: ...Service support A 1 Product support 70 Operating Instructions 06 2020 ...
Страница 76: ...Known problems C 1 Known problems of the current software version 74 Operating Instructions 06 2020 ...
Страница 79: ......