![Siemens SIMOTICS CONNECT 600 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/siemens/simotics-connect-600/simotics-connect-600_operating-instructions-manual_1265402019.webp)
3.4
Overview of the overall system
The following diagram provides you with an overview of the system:
6,'5,9(,4
SIMATIC IPC127E
SIMOTICS CONNECT 600
,QGXVWULDO(WKHUQHW
&XVWRPHU
'DWD
7UDQVIHU
Induction motor
'ULYH
6\VWHP
$QDO\]HU
Local
Service PC
&RQIL
JXUDWLRQ
SIMOTICS CONNECT 600
SIMATIC
S7-1200
SIPLUS
SM1281
SIPLUS
SM1231
7UXVWHG=RQH
①
Direct physical network connection (point-to-point Ethernet cable) to the local service PC for commissioning and
maintenance
②
Dedicated network connection (e.g. VLAN) between the IPC and the sensor box attached to the motor
③
We recommend using an Industrial Ethernet security module at the interface between the internal production network
and the external network (Internet)
Figure 3-3
System overview
3.5
Data security
The IPC saves the converter data unencrypted until it is transferred into the Cloud. The IPC
transfers the data into the Cloud according to the TLS standard (Transport Layer Security V1.2)
encrypted via an additional firewall (Windows Firewall).
Always keep the Windows Firewall activated to protect the device.
Before returning or disposing of the connectivity module, delete all data on the IPC. The relevant
instructions can be found in Chapter Deleting the data of the connectivity module (Page 58).
Hardening measures
Information about hardening measures is available on the Internet (
global/en/home/products/services/cert.html
). Under no circumstance weaken the following
hardening measures of the connectivity module.
• Verification of the operating system integrity
• Windows updates
• Configuration of the Windows Firewall
Description
3.5 Data security
Operating Instructions, 06/2020
17
Содержание SIMOTICS CONNECT 600
Страница 2: ......
Страница 8: ...Introduction 1 2 Naming convention 6 Operating Instructions 06 2020 ...
Страница 14: ...Safety instructions 2 6 Security recommendations 12 Operating Instructions 06 2020 ...
Страница 34: ...Connection 6 3 Connecting the IPC 32 Operating Instructions 06 2020 ...
Страница 42: ...Operation 8 1 Data evaluation with SIDRIVE IQ 40 Operating Instructions 06 2020 ...
Страница 62: ...Maintenance 9 11 Deleting the data of the connectivity module 60 Operating Instructions 06 2020 ...
Страница 66: ...Replacement parts 10 2 Replacement parts for the connectivity module 64 Operating Instructions 06 2020 ...
Страница 70: ...Disposal 11 4 Information according to Article 33 of the REACH regulation 68 Operating Instructions 06 2020 ...
Страница 72: ...Service support A 1 Product support 70 Operating Instructions 06 2020 ...
Страница 76: ...Known problems C 1 Known problems of the current software version 74 Operating Instructions 06 2020 ...
Страница 79: ......