7-1
DP/PA Link and Y Link Bus Couplings
A5E00193841-011
Commissioning the Y Link
Overview of contents
This chapter describes the steps involved in commissioning the Y link. A detailed
explanation of these steps is found in subsections 7.2 and 7.3
Section
Topic
Page
7.1
Commissioning the Y link
7.2
Configuring the Y link
7.3
Configuring the underlying DP slaves
7.1
Commissioning the Y link
Prerequisites
The following prerequisites must be met before you commission the Y link:
You must have completed the setup and wiring of the DP/PA link as described
in Sections 3 and 4.
You must have completed the setup of the H system and the redundant DP
master system. PROFIBUS-DP must be ready for operation.
You must have completed the setup of the underlying DP master system and
have connected it to the Y coupler. PROFIBUS-DP must be ready for operation.
Commissioning the Y link
Step
Activity
1
Configure the Y link.
2
Configure the underlying DP slaves.
3
Switch on the power supply for the Y link.
4
Set the PROFIBUS address of the IM 157 (see Section 6.4).
5
Load the configuration into the target system.
7
Содержание Simatic 6ES7 157-0AC80-0 A0 Series
Страница 14: ...Contents xiv DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...
Страница 42: ...Installation 3 12 DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...
Страница 70: ...Commissioning the DP PA Link 6 12 DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...
Страница 162: ...Technical Specifications B 40 DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...
Страница 170: ...Order Numbers and Accessories D 4 DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...
Страница 178: ...Glossary Glossary 8 DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...
Страница 182: ...Index Index 4 DP PA Link and Y Link Bus Couplings A5E00193841 01 1 ...