Manual call points FDM223H and FDM224H (housing FDMH292-R)
w
The manual call point FDM223H/FDM224H is prepared for installation. See the
chapter 'Preparation [➙ 27]'.
1. Secure the housing at a height of 0.9…1.6 m on an even surface.
–
Only use the screw holes marked with arrows (see diagram below).
2. Pull the cables into the housing through the openings in the cable gripper.
–
In wet areas, use metal cable glands M20 x 1.5 (accessories) instead of
cable grippers.
a
The manual call point FDM223H/FDM224H is now prepared for electrical
connection.
Figure 11: Screw holes in housing FDMH292-R
Mounting / Installation
Installation
5
30 | 54
007002_k_en_--