Installation, connecting up, commissioning
3.2 Installing, connecting up and commissioning
CP 1243-1
34
Operating Instructions, 04/2017, C79000-G8976-C365-03
3.2
Installing, connecting up and commissioning
Prior to installation and commissioning
CAUTION
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller", refer to the documentation in the
Appendix.
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
Pulling/plugging the module
NOTICE
Turning off the station when plugging/pulling the module
Before pulling or plugging the module, always turn off the power supply to the station.
Dimensions for installation
Figure 3-1
Dimensions for installation of the S7-1200
Содержание CP 1243-1
Страница 10: ...Table of contents CP 1243 1 10 Operating Instructions 04 2017 C79000 G8976 C365 03 ...
Страница 116: ...Configuration 4 12 Access to the Web server CP 1243 1 116 Operating Instructions 04 2017 C79000 G8976 C365 03 ...
Страница 140: ...Dimension drawings CP 1243 1 140 Operating Instructions 04 2017 C79000 G8976 C365 03 Figure B 2 From above ...