9. On the Web UI, enter all required Non-Vital Configuration parameters specified by the
railroad or agency.
a. When required, unlock the Edit button when required to edit specific parameters.
b. When the changes are complete, select Save and then select Reboot.
c. Set values as described in Section 7 in accordance with the railroad or agency site plan.
d. Close the Web UI.
10. On the Web UI, enter all required Non-Vital Configuration parameters specified by the
railroad or agency.
a. When required, unlock the Edit button when required to edit specific parameters.
b. When the changes are complete, select Save and then select Reboot.
c. Set values as described in Section 7 in accordance with the railroad or agency site plan.
d. Close the Web UI.
4.7
PLACE A VIU-20 IN OPERATION
1. Verify signal aspects reported by the VIU-20 against the actual signals on the ground.
2. If switches are programmed, verify the switch position reported by the VIU-20 against the
actual switch position on the ground.
3. If hazard detectors, such as high-water detectors, slide fences, etc., are programmed, verify
the function by removing the input from the VIU-20.
4. Observe train moves to verify proper operation of the signal system.