
Connection
4.4 Connecting to the RS485 bus
PAC1020
Equipment Manual, 05/2020, L1V30610008B-01
35
4.4
Connecting to the RS485 bus
Procedure
Connect the PAC1020 power monitoring device to the RS485 bus via the integral interface.
Please pay attention here to the general topology of the two-wire line.
1.
Connect all three lines to the screw terminals.
2.
Ensure a bus terminating resistance is set at the first and last communication node.
Block diagram
TER
Bus termination resistor (termination)
PU
Pull-up resistor
PD
Pull-down resistor
①
Grounding of the cable shield
②
Grounding of the common line, preferably only at one point for the whole bus
Figure 4-9
Block diagram: General RS485 topology
Содержание 7KM1020-0BA01-1DA0
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents PAC1020 6 Equipment Manual 05 2020 L1V30610008B 01 ...
Страница 22: ......
Страница 44: ...Commissioning 5 6 Checking the displayed measured values PAC1020 42 Equipment Manual 05 2020 L1V30610008B 01 ...
Страница 50: ...Operation 6 1 Device interface PAC1020 48 Equipment Manual 05 2020 L1V30610008B 01 ...
Страница 77: ...Technical data 10 1 Labeling PAC1020 Equipment Manual 05 2020 L1V30610008B 01 75 ...
Страница 78: ......
Страница 93: ......
Страница 94: ......