
Installation
3.1 Panel mounting
PAC1020
Equipment Manual, 05/2020, L1V30610008B-01
23
3.1
Panel mounting
You require the following tool for installation:
•
Cutting tool for the panel cutout
Additional installation accessories
•
Cable clamp for strain relief of the communication cable and the connecting cables at the
digital inputs/outputs.
3.1.1
Mounting dimensions
Mounting and clearance dimensions
You can find information on the cutout dimensions, frame dimensions and clearances in
chapter Dimensional drawings (Page 77).
3.1.2
Installation steps
Installation steps
Proceed as follows to install the power monitoring device in the panel:
Figure 3-2
Installation
Note
Plate thickness
With plate thicknesses < 1 mm or > 2 mm, the use of optionally available mounting adapters
(7KM9900-06A00-0AA0) is recommended.
Содержание 7KM1020-0BA01-1DA0
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents PAC1020 6 Equipment Manual 05 2020 L1V30610008B 01 ...
Страница 22: ......
Страница 44: ...Commissioning 5 6 Checking the displayed measured values PAC1020 42 Equipment Manual 05 2020 L1V30610008B 01 ...
Страница 50: ...Operation 6 1 Device interface PAC1020 48 Equipment Manual 05 2020 L1V30610008B 01 ...
Страница 77: ...Technical data 10 1 Labeling PAC1020 Equipment Manual 05 2020 L1V30610008B 01 75 ...
Страница 78: ......
Страница 93: ......
Страница 94: ......