Installation
7.3 Connecting SITOP BAT1600 battery modules to the UPS module
SITOP UPS1600 / BAT1600 / UPS1100
214
Equipment Manual, 07.2021, A5E37775406-11-76
①
Power terminals
②
Communication terminals
Commissioning the SITOP BAT1600 battery module
Figure 7-3
Commissioning
1.
When supplied, LiFePO4 batteries are internally disconnected and therefore must first be
connected.
2.
Insert fuse
③
.
3.
For 3.2 Ah and 12 Ah devices: Move the fuse cover over the fuse until it latches into place.
4.
Connect power
①
and communication connectors
②
to the SITOP UPS1600.
Carefully
check that the wiring polarity is correct!
5.
Plug-in the connector at the battery module and commission the system.
After approximately 5 s battery module SITOP BAT1600 is detected by the SITOP UPS1600.
Содержание 6EP4131-0GB00-0AY0
Страница 6: ...Overview SITOP UPS1600 BAT1600 UPS1100 6 Equipment Manual 07 2021 A5E37775406 11 76 ...
Страница 12: ...Table of contents SITOP UPS1600 BAT1600 UPS1100 12 Equipment Manual 07 2021 A5E37775406 11 76 ...
Страница 186: ...Troubleshooting 4 1 Hardware fault SITOP UPS1600 BAT1600 UPS1100 186 Equipment Manual 07 2021 A5E37775406 11 76 ...
Страница 252: ...Technical data 8 8 Dimension drawing SITOP UPS1600 BAT1600 UPS1100 252 Equipment Manual 07 2021 A5E37775406 11 76 ...
Страница 262: ...Environment SITOP UPS1600 BAT1600 UPS1100 262 Equipment Manual 07 2021 A5E37775406 11 76 ...