Table 6-3
Connection technology (with cable lug / connection without cable lug)
Terminal box
Connection
GT640
1XB1621
1XB1631
1XB1634
1XB9600
Connection without cable lug not
possible
6.4.1
Bringing cables into the terminal box 1XB16.. and routing them with gable gland
The connection cables are inserted into the terminal box via an exchangeable cable entry plate
or cable entry support . The cable entry plate is drilled by default. The cable glands are not
included in the standard scope of supply.
For the explosion-proof version, the cable entry plate is not drilled by default. This enables you
to adapt the number and size of the boreholes to the rated conditions.
The cable entry can be turned by 180°.
Table 6-4
Cable entry plate versions
Terminal box
Standard
Explosion-proof version
1XB1621
Cable entry plate with
2 x M80 x 2 + 2 x M25 x 1.5 boreholes
Undrilled
1XB1631
Cable entry plate with
4 x M80 x 2 + 2 x M25 x 1.5 boreholes
Undrilled
1XB1634
1XB9600
Onion ring only
-
Insert the cable into the terminal box
1. Unscrew the cable entry plate.
2. Drill the required number of holes or tapped holes in the required size into the cable entry
plate, if necessary. Ensure that the cable entry plate can be assembled after drilling and
that it features sufficient stiffness.
3. Fit the required cable glands.
4. Route the cables through the cable glands.
5. Fit the cable entry plate to the terminal box with the assembled cables.
6. Connect the ends of the cables to the terminals in accordance with the circuit diagram. The
circuit diagram is located in the cover of the terminal box.
Refer to the "Connecting cables..." section for more information.
Electrical connection
6.4 Connection
SIMOTICS TN Series N-compact 1LA8
Operating Instructions 05/2014
69
Содержание 1LA8
Страница 2: ...23 05 2014 10 18 V8 00 ...
Страница 12: ...Table of contents SIMOTICS TN Series N compact 1LA8 12 Operating Instructions 05 2014 ...
Страница 14: ...Introduction 1 1 About these instructions SIMOTICS TN Series N compact 1LA8 14 Operating Instructions 05 2014 ...
Страница 60: ...Assembly 5 3 Installing the machine SIMOTICS TN Series N compact 1LA8 60 Operating Instructions 05 2014 ...
Страница 88: ...Start up 7 7 De energizing SIMOTICS TN Series N compact 1LA8 88 Operating Instructions 05 2014 ...
Страница 100: ...Operation 8 11 faults SIMOTICS TN Series N compact 1LA8 100 Operating Instructions 05 2014 ...
Страница 173: ...AC Declaration of conformity 1LA8 area 22 AA KE NSR _1LA8_1PQ8_1PP8_1LP8 ...