● Before starting up a machine for the first time
● After an extended period in storage or downtime
● Within the scope of maintenance work
The following information is provided regarding the state of the winding insulation:
● Is the winding head insulation conductively contaminated?
● Has the winding insulation absorbed moisture?
As such, you can determine whether the machine needs commissioning or any necessary
measures such as cleaning and/or drying the winding:
● Can the machine be put into operation?
● Must the windings be cleaned or dried?
Detailed information on testing and the limit values can be found here:
"Testing the insulation resistance and polarization index" (Page 45)
9.1.4
Inspections in the event of faults
Natural disasters or unusual operating conditions, such as overloading or short circuit, are
faults that overload the machine electrically or mechanically.
Immediately perform an inspection after such faults.
9.1.5
First service after installation or repair
Perform the following checks after approximately 500 operating hours or one year, whichever
comes first:
Table 9-1
Checks after assembly or repair
Check
When the
motor is
running
At
standstill
The stated electrical characteristics are being observed
X
The permissible bearing temperatures are not exceeded (Page 86).
X
The smooth running characteristics and machine running noise have not
deteriorated
X
The motor foundation has no cracks and indentations. (*)
X
X
(*) You can perform these checks while the motor is running or at a standstill.
Additional tests may also be required according to the system-specific conditions.
NOTICE
If you detect any deviations during the inspection, you must rectify them immediately. They
may otherwise cause damage to the machine.
Maintenance
9.1 Inspection and maintenance
SIMOTICS TN Series N-compact 1LA8
104
Operating Instructions 05/2014
Содержание 1LA8
Страница 2: ...23 05 2014 10 18 V8 00 ...
Страница 12: ...Table of contents SIMOTICS TN Series N compact 1LA8 12 Operating Instructions 05 2014 ...
Страница 14: ...Introduction 1 1 About these instructions SIMOTICS TN Series N compact 1LA8 14 Operating Instructions 05 2014 ...
Страница 60: ...Assembly 5 3 Installing the machine SIMOTICS TN Series N compact 1LA8 60 Operating Instructions 05 2014 ...
Страница 88: ...Start up 7 7 De energizing SIMOTICS TN Series N compact 1LA8 88 Operating Instructions 05 2014 ...
Страница 100: ...Operation 8 11 faults SIMOTICS TN Series N compact 1LA8 100 Operating Instructions 05 2014 ...
Страница 173: ...AC Declaration of conformity 1LA8 area 22 AA KE NSR _1LA8_1PQ8_1PP8_1LP8 ...