Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
www.shorestation.com
0004160
Page
19
of
25
Rev
B
10/7/2010
On the corner posts opposite the winch, slide the channel bracket for spacer tube over the top of the
posts aligning the holes and insert a 3/8 X 2 3/4 carriage bolts from the inside out and secure with
flange lock nuts. Slide the spacer tube into the channel bracket and align the holes in the bracket with
those in the tube insert 3/8 X 2 3/4” carriage bolts from the inside of the hoist out and secure with flange
lock nuts.
At this time you will tighten all the bolts for the braces and brackets just installed.
1440101 - HEX LOCKNUT FLANGE 3/8-16 W/T
0210126 - CARR 3/8-16 X 2 3/4 GR5
70579 - CHANNEL SPACER TUBE SS1564
70580 - TUBE SPACER 2X2 SS1564