
58
Problems when starting evacuation
5. No ready status after automatic start
Check the GC settings.
□
Is an appropriate carrier gas pressure set at the GC?
An inappropriate carrier gas supply can result in no pressure increase at the column
inlet, so that the automatic startup sequence does not begin (and the rotary pump
does not operate). Check that the set carrier gas conditions are suitable for the
column.
Check the rotary pump.
□
Is the rotary pump rotating?
If not, check the wiring.
If the wiring is correct, see section
4.4 Main Power Assy
.
Check for leaks.
□
Is the unit front door completely closed?
Occasionally, dust can cause minute leaks. Check that no dust is sticking to the
O-ring contact faces before closing the front door.
□
Is there any leakage from the interface column connector?
Leakage can occur from the interface unit after repeated analysis with heating.
Tighten the connector slightly (about 1/6 turn).
Caution: Fully tightening the connector with the wrench supplied could damage the
screw threads. If slight re-tightening does not stop the leakage, replace the ferrule.
□
Is the column broken?
It is impossible to maintain a vacuum if the column breaks near the interface unit. If
the column is scratched during maintenance, it tends to break at the scratch.
□
If the analysis tube was opened during maintenance, is there any leakage from it?
If a normal vacuum could be maintained before maintenance but not after it, initially
check the positions where maintenance work were conducted and the interface
column connector (the temperature has been dropped).
Содержание GCMS-QP2010 Series
Страница 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Страница 14: ...14 Do not increase the ion source or interface temperature above the level required for analysis...
Страница 27: ...27...
Страница 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Страница 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Страница 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Страница 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Страница 79: ...79 DC POWER A Block Diagram...
Страница 84: ...84 MAIN CTRL A Block Diagram...
Страница 85: ...85...
Страница 90: ...90 IS CTRL A Block Diagram...
Страница 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Страница 98: ...98 IG CTRL A PCB Block Diagram...
Страница 103: ...103 CP6 24V normal range 22 7 to 25 3VDC CP7 24V normal range 22 7 to 25 3VDC CP12 5V normal range 4 8 to 5 3VDC...
Страница 109: ...109 DI CTRL A block diagram...
Страница 145: ...121 5 Remove the IS CTRL A Board Unit Disconnect the two connectors Remove the three screws and the spacer screw...
Страница 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Страница 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Страница 154: ...130 10 Preparation of new TW300 New TW 300 Removed TW300 Check the name plate Old type New type...
Страница 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Страница 158: ...134 Hook the right side hooks on the neck of inlet Attach the left side screws and hooks Fasten lightly the 4 screws...
Страница 160: ...136 Remove the cardboard Completion of TMP mounting...
Страница 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Страница 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Страница 164: ...140 14 Place the covers Place the front cover Place the front door...