19
and the system will consider 3F and 5F are adjacent and all linkages can be
scrolled normally.
Zone setup:the zone can be named in "position description"; the initialization value in
the figure is "zone 1-N".
Figure 4
‑
4 Zone setup interface
Building setup:
the building can be named in "position description"; the initialization
value in the figure is "building 1-N".
Figure 4-5 Building setup interface
Floor setup:
press OK button to save the setup and exit; press cancel button to retain
the original setup and exit.