![Sharp MX-M623N Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/sharp/mx-m623n/mx-m623n_installation-manual_365792081.webp)
MX-M753N MX-EBX3 13 – 3
D. Reattach the control PWB and the right cabinet
upper
• If the fax box unit is installed, carry out steps 1) and 2) addi-
tionally.
1)
Pass the interface cable through the hole of the sheet metal of
the control PWB, connect it to the control PWB.
2)
Attach the snap band to the sheet metal of the control PWB
unit.
3)
Push the control PWB unit into the main unit.
4)
Secure the unit with the four screws.
• If the fax box unit is installed, carry out step 5).
5)
Fit the interface cable into the right cabinet upper.
6)
Attach the right cabinet upper to the main unit.
7)
Secure the right cabinet upper with the three screws.
• Reconnect the cables that have been removed in step B to the
original positions of the control PWB unit.
E. Turn ON the power of the main unit
1)
Insert the power plug of the main unit into the power outlet.
2)
Open the front cabinet. Turn ON the power switch in the front
cabinet of the main unit.
3)
Turn ON the power switch on the operation panel.
4)
Use SIM22-5 to check the firmware version of the MX-EBX3.
The ACRE version must be 03.00.J2 or later. If the version is
02.00.J2, revise the version according to procedure 5).
5)
Use SIM49-1 to revise the firmware to the latest version.
Then, perform procedure 4).
ON
ǂǂǂ6,08/$7,21ǂǂ12
&/26(
7(67
61
,&80$,1
1,&
,&8%227
/$1*8$*(
*5$3+,&
3&8
6&8
63)
)$;0$,1121(
'(6.121(
/&&
),1,6+(5
381&+
32:(5&21
(0$18$/
:$7(50$5.
(6&3
3'/
$&5(%227
-
$&5(0$,1-
$&5('$7$-