MX-7000N MX-PNX2A/B/C/D 6 – 4
2)
Install the Connection fixture R (Package part No. 8) to the
main unit with the fixing screws (Package part No. 4).
D. Check of the connected position of main unit
and finisher
1)
Engage the finisher that has installed punch unit to the main
unit, and temporarily fix.
* Insert the rail of the finisher unit into the rail reception fixture
of main unit, fix temporarily.
2)
Open the front door of punch unit.
3)
Check that the center of the screw hole of the punch unit is in
the range of specification of an oval hole of the mounting fix-
ture in front side of main unit.
* When not the range of specification, execute the adjustment
procedure of each finisher. If the adjustment is not required,
execute the procedure for touch of the auxiliary caster with
the floor of each finisher.
E. Adjustment
* Refer to the adjustment procedure of each finisher.
F. Touch of the auxiliary caster with the floor.
* Refer to the procedure for touch of the auxiliary caster with the
floor of each finisher.
G. Install to main unit
1)
Engage the finisher that has installed punch unit to the main
unit.
2)
Open the front door of punch unit.