
Doc
#
E166703
8-9
8: Using Ethernet Communication
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
5. You are now in Setup Mode. You can configure the parameters for the software you
are using by either:
• Keying a new value next to a setting and pressing Enter
• Keeping the default value (the value in brackets after a setting) by just pressing
Enter without keying in anything
6. Be sure to press “S” once you are finished, in order to store any new settings. The
Ethernet interface will then perform a power reset.
8.3.4: Setup Details
This section illustrates how each section of settings appears on the screen, when you
select the setting number (1, 6, or 7).
CAUTION!
Change Settings 1, 6, and 7 ONLY. Settings 2, 3, and 4 MUST be the same
as shown in 8.2.1: Modbus/TCP to RTU Bridge Setup Default Settings, on page 8-3. If
they are not, reset them to the values shown in Section 8.2.1, using the reset instruc-
tions in 8.4: Network Module Hardware Initialization, on page 8-14.
Network IP Settings Detail (1) (Set device with static IP Address.)
Network Mode: 0=Wired only, 1=Wireless Only <0> ? Key 1 and press Enter for WiFi
mode.
IP Address <010> 192.<000> 168.<000> .<000> .<001> You can change the IP
address in this setting.
Set Gateway IP Address <N> ? Y (If you want to change the Gateway address.)
Gateway IP Address : <192> .<168> .<000> .<001> (You can change the Gateway
address in this setting.)
Set Netmask <N for default> <Y> ? Y (If you want to change the Netmask.)
<255> .<255> .<255> .<000> (You can change the Netmask in this setting.)
Change telnet config password <N> ? N
WLAN Settings Detail (6)
(The settings shown are recommended by EIG for use
with the MP200 metering system. You will only be able to access these settings if you
have set Network Mode to “1” (to select Wireless mode) in the Network IP Settings
Detail, shown previously.)
Содержание MP200
Страница 1: ...V 1 07 November 5 2018 ...
Страница 2: ...This page intentionally left blank ...