
Doc
#
E166703
6-7
6: Using the Watt-Hour Test Pulses
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
16. Start the test as per the appropriate procedure for the Standard used.
17. When the test is completed, remove the current inputs from the meter.
18. Remove power from the sources.
19. Place the photo detector over the next test pulse LED to be monitored.
20. Repeat 5 through 19 until all current inputs and test pulses have been tested.
21. De-energize all circuits and remove power from the Standard, sources, and the
MP200 unit.
22. Disconnect all connections from the MP200 unit.
Содержание MP200
Страница 1: ...V 1 07 November 5 2018 ...
Страница 2: ...This page intentionally left blank ...