2021/8/19
www.sermatec-ess.com
18
Installation
STEP 1
:
Crimp the H4 connector to the cable as required
Battery cable size: 6mm²
STEP 2
:
Use multimeter to measure Battery side voltage
and verify correct polarity, ensure open-circuit
voltage is less than 800V.
STEP 3
:
Connect positive and negative terminals to the
corresponding interfaces.
Содержание SMT-10K-TL-TH
Страница 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Страница 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Страница 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Страница 14: ...2021 8 19 www sermatec ess com 14 Installation...
Страница 19: ...2021 8 19 www sermatec ess com 19 Installation...
Страница 20: ...2021 8 19 www sermatec ess com 20 Installation...
Страница 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Страница 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Страница 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Страница 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Страница 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Страница 43: ...Thanks...