2021/8/19
www.sermatec-ess.com
10
Installation
Installation requirements
1. Wall bracket Installation
1) It is necessary to ensure that the installation position is flat and the thickness
of the whole wall exceeds 100mm.
2) Ensure the installation wall is vertical to the ground. If it is sloping , tilt angle
is only allowed to be less than 15
°
.
3) Ensure installation wall is solid enough to meet the requirements of load
bearing for hybrid inverter.
4) The mounting position is supposed to avoid direct sunlight.
2. Installation space requirements
Product installation position, leave 300 mm of space for maintenance and heat
dissipation left, right and front
Содержание SMT-10K-TL-TH
Страница 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Страница 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Страница 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Страница 14: ...2021 8 19 www sermatec ess com 14 Installation...
Страница 19: ...2021 8 19 www sermatec ess com 19 Installation...
Страница 20: ...2021 8 19 www sermatec ess com 20 Installation...
Страница 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Страница 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Страница 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Страница 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Страница 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Страница 43: ...Thanks...