2021/8/19
www.sermatec-ess.com
17
Installation
Connect BAT cable
Batteries need to comply with local regulations.
Suggestion
: If the battery is to be installed indoor for details please refer to battery
Manufacture’s user manual.
Suggestion
: Batteries must be installed with a distance to each other, details
please refer to battery manufacture’s user manual.
As for the number of cells used, it will be decided by customer’s choice, the choice
must comply with the followed requirement: the voltage is 200-800V.
Содержание SMT-10K-TL-TH
Страница 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Страница 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Страница 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Страница 14: ...2021 8 19 www sermatec ess com 14 Installation...
Страница 19: ...2021 8 19 www sermatec ess com 19 Installation...
Страница 20: ...2021 8 19 www sermatec ess com 20 Installation...
Страница 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Страница 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Страница 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Страница 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Страница 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Страница 43: ...Thanks...