2021/8/19
www.sermatec-ess.com
34
Working Modes
1. General Mode: Suitable for Areas with Stable Grid
When PV is sufficient, PV supplies power in the sequence of Load
→
Battery
→
Grid.
When PV is insufficient, Battery and Grid supplies power to the load together with insufficient PV.
2. Energy Storage Mode: Suitable for Areas with Unstable Grid
PV and Grid supplies power to the Load and charge the Battery.
When the Grid is normal, the SOC of Battery keeps 100%.
Battery discharges only when Grid is abnormal.
Anti-back flow defaults to prohibited
Содержание SMT-10K-TL-TH
Страница 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Страница 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Страница 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Страница 14: ...2021 8 19 www sermatec ess com 14 Installation...
Страница 19: ...2021 8 19 www sermatec ess com 19 Installation...
Страница 20: ...2021 8 19 www sermatec ess com 20 Installation...
Страница 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Страница 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Страница 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Страница 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Страница 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Страница 43: ...Thanks...