It is recommended to follow the set up sequence below when configuring and installing a control
panel from new.
Follow the cable commissioning procedure T625-700-920.PDF
if you don't have a copy of this download it from www.sensors.ltd.uk
Perform a sensor FIND and automatically install detector data. Engineers Menu .... Find Option
(note panels are usually supplied pre-configured so this
many not be necessary, check shipping documentation)
Set the sensor channel alarm levels. User menu ... Alarm Setup Options AL1 and AL2 for each
channel.
(note panels are usually supplied pre-configured so this
many not be necessary, check shipping documentation)
Allow the system to run for at least a few hours then:
Zero each connected detector. User Menu ZERO
Calibrate each detector. User Menu CALibrate
EXIT to normal operation and check alarm operation by applying calibration gas and observing
alarm activation.
Make sure all components are communicating correctly. Engineers menu TEST ADD option.
find
1 of 9
alarm 1
3 of 8
alarm 2
4 of 8
zero
1 of 8
cal
2 of 8
test add
3 of 9
Putting Into Service
Note that this product should be supplied via a fused spur. Ensure cables used are suitable for both
their intended area of operation and load capability. This product should only be installed by a
competent person.
Page 10 of 25