14
3 Motor Unit installation
3.1 Installation preparations Furlex Electric (above deck)
Space requirements
Please check so that there is enough space for the installation. The dimensions are given in the
section ”2.5 Technical Specification”.
Consider space for an anchor. Extension links are available if more space is needed below the
furler, listed in section ”2.4 Optional parts”.
Strength of the forestay attachment
Furlex Electric above deck uses a reinforced toggle capable of handling the torque load.
The forestay attachment needs to have sufficient strength to handle the torque loads, with
dimensions according to the table below:
Forestay Dimension, mm
Toggle
Ø6
Ø7
Ø8
Ø10
Art No
539-680-01
539-681-01
539-682-01
539-683-01
Length (H)
45
45
55
55
Ø Clevis pin (D1)
12
12
14
16
Fork Width (W1)
10,7
10,7
14,2
14,2
Ø Clevis pin (D2)
10
12
14
16
Fork Width (W2)
12
14
14
16
Forestay Dimension, mm
Extension link
Ø6
Ø7
Ø8
Ø10
Art No
517-115-01
517-115-01
517-116-01
517-116-01
Length (H)
90
90
130
130
Ø Clevis pin (D1)
12
12
16
16
Fork Width (W1)
10,2
10,2
13,7
13,7
Eye (D2)
12,5
12,5
16,5
16,5
Thickness (W2)
10
10
13,5
13,5
H
W2
W1
D2
D1
W3
D1
W1
H
W2
D2
Содержание Furlex Electric
Страница 1: ...597 274 E 2019 04 24 Supplementary manual...
Страница 47: ...47...
Страница 49: ...49 Notes...
Страница 50: ...50...
Страница 51: ...51...
Страница 52: ...597 274 E Printed in Sweden www seldenmast com...