Page 4.10
4.0 Prior to Operation
Prior to Operation for 548.10 G \ 05.2007 \
Final checkup
Prior to turning the system on and to start ope ra ti on, you should
conduct all following
fi
nal checkups and to ans wer all questions
with
“yes”
:
X
Did you read and understand the chapter 2 “Safety
instructions” in this operating manual?
X
Did you remove the packaging material from the sys-
tem completely?
X
Did you place the system on a table to carry the
system’s weight?
X
Are the dimensions of the table the same as the sys-
tem?
X
Did you connect the exhaust air nozzle of the system
to your internal exhaust air system and did you check
whether this connection is tight?
X
Does the power supply correspond to the require-
ments as stated on the type plate?
X
Did you have the electrical connection made by a
specialist?
X
Do the fuses in your production plant correspond to
the system’s requirements?
After having answered all questions with “Yes”, please con-
ti nue to read the chapter "4.0 Operation of System”.
If you were not able to answer all questions with “Yes”, plea se
read this chapter as well as the chapter "2.0 Safety in struc tions”
again and recheck the operating instructions.
Содержание 548.10
Страница 129: ...Page 10 5 10 0 Technical Appendix Technical Appendix for 548 10 G 10 2007 Power unit 271 02 A9 ...
Страница 131: ...Page 10 7 10 0 Technical Appendix Technical Appendix for 548 10 G 10 2007 Power board 238 01 A1 ...
Страница 134: ...Page 12 1 12 0 Notes ...
Страница 135: ...Page 12 5 12 0 Notes ...