![SEF 548.10 Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/sef/548-10/548-10_operating-manual_1233278055.webp)
Page 4.5
4.0 Prior to Operation
Prior to Operation for 548.10 G \ 05.2007 \
Connecting the System
The soldering system is designed as a table system. The table
must must be designed for the weight. We recommend to take
a lon ger table for a
fi
lling area next to the soldering system.
Attention, risk of breakage
The system weighs is approx. 250 kg. The table must have
the dimension of the soldering system and must designed
for the weight.
Attention, accident hazard
The system weights is approx. 250 kg. Remove the
system from the pac kaging with 2 people on the desk. Take
care that the desk is secure and not wobbly.
The soldering system is delivered ready mounted. There is only
a short installation and connection work to do.
All connectors are placed on the rear side of the soldering
system.
X
Electrical connection 230/400VAC or
120/230VAC each 3 phases
X
Scale the system to a horizontal level
X
Connection of exhaust air
X
Connection of interface/PC
The installation and connection work will be explained on the
following pa ges.
Содержание 548.10
Страница 129: ...Page 10 5 10 0 Technical Appendix Technical Appendix for 548 10 G 10 2007 Power unit 271 02 A9 ...
Страница 131: ...Page 10 7 10 0 Technical Appendix Technical Appendix for 548 10 G 10 2007 Power board 238 01 A1 ...
Страница 134: ...Page 12 1 12 0 Notes ...
Страница 135: ...Page 12 5 12 0 Notes ...