Long term preservation of
seepex Progressive cavity pumps
Dokument / document
TI.114.01e
Ausgabe / issue
D / 07.05.08
Blatt / sheet
2 (3)
2.1.5
Recommissioning
NOTICE
Before starting work read the operating instruction.
•
Pay attention to a correct re-assembly of parts dismantled before.
2.2
Measures for preservation 2
In case of the correct storage and under consideration of the preservation measures, a
storage of the pump is possible for max. 2 years.
NOTICE
In case of a longer storage period, the dimensions and shore hardness can change.
The function of the pump can be impaired.
Bevor recommissioning Elastomere parts (stator, joint seal, gaskets, ...) have to be
checked for crack formation and change of the surface.
2.2.1
Storing of the pump/pump parts
•
in dry and closed rooms
•
free from vibration
Particular adjacent influences have to be advised by the customer and have to be checked
and released by seepex before storage.
2.2.2
Storing of the stator
Store the stator separate (relevant standard ISO 2230):
•
dry
•
constant tempered at 10-15°C (max. 25°C)
•
protected against light / stored in darkness (e.g. in a closed case or packed accordingly)
2.2.3
Gear
Note instruction of the manufacturer.
•
Follow advice on the gear.
•
Reduce quantity of lubricant to the quantity stipulated for the operation
before commissioning!
•
Reinstall vent screw during commissioning.
Belt Variable Speed Drive:
Store the belt separate (relevant standard ISO 2230):
•
dry
•
constant tempered at 10-15°C (max. 25°C)
•
protected against light / stored in darkness (e.g. in a closed case or packed accordingly)
42
Содержание BW 10
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 30: ......
Страница 32: ......
Страница 63: ......
Страница 65: ...Section 1 General Information ii Table of Contents MN400 ...
Страница 79: ...3 6 Maintenance Troubleshooting MN400 ...
Страница 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Страница 82: ......
Страница 84: ......
Страница 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Страница 86: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 158: ...BIM 1010 2005 03 6 www nord com ...
Страница 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Страница 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Страница 180: ......
Страница 181: ......
Страница 186: ......