SAFETY INSTRUCTIONS
This is the safety alert symbol. It is used to alert you to potential personal
injury hazards. Obey all safety messages that follow this symbol to avoid
possible injury or death.
WARNING
Before installing, using, or servicing this product, carefully read and fully
understand the instructions
including all warnings, cautions
, &
safety notice
statements. To reduce risk of personal injury, death and/or property damage,
follow all instructions for proper motor installation, operation and maintenance.
These instructions are not intended as a complete listing of all details for
installation, operation, and maintenance. If you have any questions concerning
any of the procedures, STOP, and call the appropriate Regal-Beloit motor
company.
Table of Contents
1.0
INSTALLER / OWNER / OPERATOR RESPONSIBILITY
1.1
Electrical Safety
1.2
Mechanical Safety
1.3
Environmental Safety
2.0
RECEIVING & INSPECTION
2.1
Initial Inspection
2.1.1
Packing List & Inspect
2.1.2
Turn Motor Shaft
2.1.3
Check Nameplate
2.2
Handling
2.2.1
Correct Lifting Angles
2.3
Storage
2.3.1
Bearing Lubrication
2.3.2
Shaft Rotation
2.3.3
Damp or Humid Storage Locations
3.0
INSTALLATION AND OPERATION
3.1
Location
3.1.1
Selecting a Location
3.1.2
Ambient Temperature Limits
3.1.3
Construction Selection per Location
3.1.3.1
Dripproof
3.1.3.2
Totally Enclosed
3.1.3.3
Hazardous Locations Motors
3.2
Mounting Motor
3.2.1
Rigid Base (Footed)
3.2.2
Rigid Base Hole Selection -6 or 8 Hole Bases
3.2.3
Vertical
3.3
Application Assembly to Motor
3.3.1
General: Proper Alignment
3.3.2
Direct Coupling
3.3.3
Direct Connected
3.3.4
Belted
3.3.5
VFD Operation
3.3.6
Accessories
3.3.6.1
General
3.3.6.2
Brake Motors
3.3.6.3
Space Heaters
3.3.6.4
Thermal Protection General, Thermostats,
Thermisters & RTDs
3.3.6.5
RTD Alarm & Trip Settings
3.3.7
Guards
3.4
Electrical Connections
3.4.1
Power Supply / Branch Circuit
3.4.1.1
Branch Circuit Supply
3.4.1.2
Fuses, Breakers, Overload Relays
3.4.1.3
AC Power Supply Limits
3.4.2
Terminal Box
3.4.2.1
Conduit opening
3.4.2.2
Hazardous Locations
3.4.3
Lead Connections
3.4.3.1
Wire Size Requirements (Single Phase)
3.4.3.2
Extension Cords (Single Phase)
3.4.4
Ground Connections
3.4.5
Start Up
3.4.5.1
Start Up – No Load Procedure
3.4.5.2
Start Up – Load Connected Procedure
3.4.5.3
Jogging and/or repeated starts
4.0
MAINTENANCE
4.1
General Inspection
INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER’S USE
OWNER: READ AND SAVE THESE INSTRUCTIONS
Содержание BW 10
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 30: ......
Страница 32: ......
Страница 63: ......
Страница 65: ...Section 1 General Information ii Table of Contents MN400 ...
Страница 79: ...3 6 Maintenance Troubleshooting MN400 ...
Страница 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Страница 82: ......
Страница 84: ......
Страница 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Страница 86: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 158: ...BIM 1010 2005 03 6 www nord com ...
Страница 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Страница 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Страница 180: ......
Страница 181: ......
Страница 186: ......