LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL
|
7
ILL1052-C
MOUNTING THE COOLER
Once the cooler is on the roof, carefully lift the assembly onto
the transition and into place. The assembly will only fit onto
the transition in one orientation. Refer to the engraved details
moulded into the transition.
Ensure that the clips in all four corners engage correctly.
Do not use any screws to fix the cooler to the transition.
Important!
Do not place the venturi assembly into the cooler
at this stage.
Your installation kit includes the power cable with ends ready to
terminate, and a control cable.
For Australian Only
Drop the power cable plug end along with the taped end of
the control cable into the dropper duct. Route the power cable
socket end with the control cable upwards through the corner
hole in the transition and out the tank cavity.
Lock the power cable socket in place by sliding the plug in
sideways into the tank as shown. For now, leave the control
cable end in the tank as it will be connected later.
Pass the cables through the grommet in the dropper. Place
excess length of the cables in the roof cavity and not inside the
cooler or dropper. Do not coil the power cable.
Push the cables into the cable slot in the transition (control
cable first) and then seal the hole with the plug provided.
Important!
Test the AutoWinterseal operation and ensure that
the cables in the dropper do not interfere with the operation of
the assembly.
ILL1288-C
ILL1181-A
CABLE INSTALLATION cont.
CABLE INSTALLATION
For Rest of the World
Pass the taped end of the wall control cable through the conduit
adaptor (factory fitted in the transition) and leave about 0.5m
(20”) in the water tank.
Take the power cable and drop the non-plug end down the
hole where the electronics module was and pass it through the
conduit adaptor.
Important!
Pass the wall control cable through
the conduit first.
Lock the power cable socket in place by sliding the plug in
sideways into the tank as shown.
Now pass the cables through your main conduit and connect
the main conduit to the conduit adaptor (under the transition).
Terminate the power cable in a junction box installed nearby.
The fixed wiring must be fitted with an isolation switch that
breaks the active (hot) and neutral (common) in accordance
with local wiring rules. We recommend the junction box be
located and installed on the duct.
Do not penetrate the duct near the AutoWinterseal.
Note!
The maximum length for the wall control cable to travel
alongside the power cable is 10m (33’)
.
WARNING!
Do not let cables, cable ends, or the control box
get wet. Position the cables in the dropper so they will be
accessible from inside the roof space.