LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL
|
11
CPQ/LCQ/LCS
TBQ/TBS
BMQ
LCQI/TBQI/TBSI
D
E
A
B
INSTALLING THE VENTURI / FAN ASSEMBLY
ILL1076-F
Important!
Make sure the venturi is correctly and symmetrically
located all the way around its cavity. Check this by making sure
the venturi sits inside the locating ridge all the way around (C).
Ensure the plug/lead assembly is not caught under the bottom
lip of the venturi, by pulling the lead through fully.
For LCQI, TBQI & TBSI coolers, ensure the venturi is sitting flat
in the tank by checking all the venturi ribs are in contact with
(D). It is recommended to relocate the tabs on the venturi back
into the slots in the tank, as it was fitted during transport. The
securing screws (x2) do not need to be re-fitted.
Feed the motor lead through the channel (E) in the mounting
bracket where the electronics module sits. Snare the lead into
one of the brackets at the top of the opening (E).
Ensure the bottom of the lead is aligned with the bracket inside
the tank. Failure to do this may result in the cable being caught
between the outside of the bracket and the venturi (A). If fitted,
route the motor tether through bracket at (A) and wedge it
between the venturi and the tank at edge (B).
ELECTRICAL CONNECTION
Connect the motor cable to the base of the electronics module.
It is a polarised plug and will only insert one way. Ensure it is
secured fully so that its retention clips are engaged.
Route the end of the wall control cable out of the cavity via
the same channel as the motor cable. Ensure you have about
200mm (8”) of wall control cable outside the cavity.
With both cables in place (inside the channel), re-assemble the
electronics module and screw it to the tank.
Important!
The isolation switch cannot be activated unless this
screw is fixed in place.
Switch OFF the electronics module before connecting any
accessories.
ILL2137-A
INSTALLING THE VENTURI / FAN ASSEMBLY
ILL496-B
ILL1060-C
ILL2116-B