3-7
© 2017 SeaStar Solutions
i7700 Installation Supplement, Rev. B
Figure 3-5. CAN2 wiring diagram, triple station, single engine.
SHIFT/THROTTLE ACTUATOR
1 x NETWORK TEE CM10060
PIGTAIL
CE42100*
MALE
TERMINATOR
CM10051
FEMALE
TERMINATOR
CM10052
MAIN STATION
CONTROL HEAD
PIGTAIL
OPTIONAL
THIRD STATION
CONTROL HEAD
HA
TCH OR CONSOL
E
MOUN
TE
D COMPONE
NT
S
DA
SH MOUN
TE
D
COMPONEN
TS
CM
10
0X
X
(W
he
re
XX
is
th
e
length
in
fe
et
re
quir
ed
.
6'
, 12
' an
d 20
' l
ength
s
ar
e
included
in
th
e
kit.
)
* The CE42100 harness contains three flying leads with female bullet connectors.
These leads are not used in the i7700 system and should be left unconnected.
PIGTAIL
CE42100*
OPTIONAL
SECOND STATION
CONTROL HEAD
CE42100*
CM20029
TEMPORARILY
INSTALLED
CANtrak SETUP
TOOL EPSK1207
3' PIGTAIL
Содержание i7700
Страница 4: ...ii 2017 SeaStar Solutions i7700 Installation Supplement Rev B This page left intentionally blank...
Страница 10: ...1 4 2017 SeaStar Solutions i7700 Installation Supplement Rev B This page left intentionally blank...
Страница 32: ...6 2 2017 SeaStar Solutions i7700 Installation Supplement Rev B This page left intentionally blank...
Страница 34: ...7 2 2017 SeaStar Solutions i7700 Installation Supplement Rev B This page left intentionally blank...
Страница 38: ...A 4 2017 SeaStar Solutions i7700 Installation Supplement Rev B This page left intentionally blank...