Section 14 STEERING SYSTEM
Subsection 02 (ALIGNMENT)
ALIGNMENT
Position handlebar in straight ahead position by
measuring each side the distance from handlebar
grip end to floorboard.
F01K07A
1
TYPICAL
1. Measuring handlebar grip end/floorboard distance
Check jet pump nozzle position by placing a
straight edge on nozzle outer end. Measure the
distance on each side of the straight edge. It
must be equalled.
F01J5ZA
1
TYPICAL
1. Measure the distance on each side of the straight edge
If necessary,
steering alignment adjustment
should be performed at steering cable support.
GTI and GTX 4-TEC Series
Open storage compartment cover and remove
basket (if so equipped).
Remove access panel (if so equipped).
RXP 4-TEC Models
Remove seat.
All Models except XP DI
Loosen 2 bolts retaining block at cable support.
Turn adjustment nut as required.
1
3
F01K18A
2
ALL MODELS EXCEPT XP DI
1. Retaining block
2. Adjustment nut
3. Loosen bolts
XP DI Models
To have access to the cable adjustment nut, open
upper storage compartment cover and remove
storage basket.
smr2004-Complete Line Up
709
www.SeaDooManuals.net
Содержание 2006 GTI
Страница 1: ...Smr 2004 ang FH8 Thu Jun 03 14 42 10 2004 Page 1 www SeaDooManuals net ...
Страница 183: ...Section 04 ENGINE 2 STROKE Subsection 06 ROTARY VALVE F01D73W 159 smr2004 Complete Line Up 161 www SeaDooManuals net ...
Страница 795: ...F17Z03 www SeaDooManuals net ...
Страница 796: ...F17Z05 www SeaDooManuals net ...
Страница 797: ...F17Z04 www SeaDooManuals net ...
Страница 798: ...F17Z06 www SeaDooManuals net ...
Страница 799: ...F08Z03 www SeaDooManuals net ...
Страница 800: ...F18Z1A www SeaDooManuals net ...
Страница 801: ...Smr 2004 ang FH8 Thu Jun 03 14 42 10 2004 Page 1 www SeaDooManuals net ...