![SeaDoo 2006 GTI Скачать руководство пользователя страница 670](http://html.mh-extra.com/html/seadoo/2006-gti/2006-gti_shop-manual_1221655670.webp)
Section 13 PROPULSION
Subsection 02 (DRIVE SYSTEM)
F01J23B
1
2
1. Engine rotation (counterclockwise)
2. Tail in opposite direction
Small Clamp
GTI Series
To secure small clamp
no. 4
, place notch side of
plier on clamp embossment and squeeze plier.
1
F02J0PB
1. Squeeze plier
Drive Shaft
4-TEC Models
NOTE:
Ensure to install floating ring before insert-
ing the drive shaft in PTO seal assembly.
Before installing drive shaft, inspect PTO seal as-
sembly. The inner sleeve must be flush with outer
circumference of the assembly. Otherwise, gen-
tly push or tap on inner sleeve until flush.
F18I0EA
1
CORRECT INSTALLATION
1. Inner sleeve flush with outer circumference
F18I0FA
1
WRONG INSTALLATION
1. Inner sleeve not flush with outer circumference
Apply a thin coat of synthetic grease (P/N 293 550
010) on the O-rings of floating ring. Do not get
grease on it's sealing surface.
670
smr2004-Complete Line Up
www.SeaDooManuals.net
Содержание 2006 GTI
Страница 1: ...Smr 2004 ang FH8 Thu Jun 03 14 42 10 2004 Page 1 www SeaDooManuals net ...
Страница 183: ...Section 04 ENGINE 2 STROKE Subsection 06 ROTARY VALVE F01D73W 159 smr2004 Complete Line Up 161 www SeaDooManuals net ...
Страница 795: ...F17Z03 www SeaDooManuals net ...
Страница 796: ...F17Z05 www SeaDooManuals net ...
Страница 797: ...F17Z04 www SeaDooManuals net ...
Страница 798: ...F17Z06 www SeaDooManuals net ...
Страница 799: ...F08Z03 www SeaDooManuals net ...
Страница 800: ...F18Z1A www SeaDooManuals net ...
Страница 801: ...Smr 2004 ang FH8 Thu Jun 03 14 42 10 2004 Page 1 www SeaDooManuals net ...