Installation
9711-92 Ku-Band TXRX
3-32
•
Mute the Transmit output of the Satellite Modem used in TX/RX antenna configurations when the antenna is
mispointed by 0.5 degrees, or more, and keep it muted until the antenna has been within 0.2 degrees of peak
pointing to the satellite for a minimum of 5 seconds (FCC part 25.221 & 25.222 TX Mute requirement).
3.6.7.5.
TS2 Synchro Gyro Compass Input.
Use the R1, R2, S1, S2 and S3 screw terminals to connect the Synchro Gyro Compass to the ACU.
3.6.7.6.
TS3 Step-By-Step (SBS) Gyrocompass Input.
Use the COM, A, B and C screw terminals to connect the SBS Gyrocompass to the ACU. Some SBS
Gyro distribution boxes have terminals which are labeled S1, S2 & S3 instead of A, B and C.
3.6.7.7.
TS4 Power
•
VREG
Screw terminal is used to provide a regulated DC operating voltage to ancillary equipment. Voltage out is
dependent upon which terminal mounting strip assembly is provided. 126865-1 supplies 8Vdc @ 1Amp, while the
126865-2 assembly supplies 5Vdc @ 2Amps.
•
GND
Screw terminal is the ground reference for the regulated and unregulated power terminals.
•
12/24
Screw terminal is commonly used to provide operating voltage to an external GPS, Dual Antenna Arbitrator
or other below decks tone generators or switches. Voltage output is based on the T.M.S assemblies JP5 jumper
settings.
3.6.7.8.
TS5 NMEA A/B, GPS output.
•
RxA- and RxA+-
screw terminals, which are defined as the NMEA A connection is used to connect to the ships
Gyro Compass (Heading). The NMEA0183 compliant inputs are then connected via a 9 pin ribbon cable to the
ACU’s J2 NMEA communications port. A GPS (Latitude and Longitude) input may also be connected, but is not
required because there is a GPS device already installed in your antenna..
NOTE:
If you connect a ships GPS to
the terminal mounting strip, you
MUST
disconnect the GPS antenna on the antenna pedestal.
•
RxB- and RxB+
screw terminals, which are defined as the NMEA B connection is used to connect to the ships
Gyro Compass (Heading). The NMEA0183 compliant inputs are then connected via a 9 pin ribbon cable to the
ACU’s J2 NMEA communications port. A GPS (Latitude and Longitude) input may also be connected, but is not
required because there is a GPS device already installed in your antenna.
•
TxA-
screw terminal is used to provide a Pseudo GPS (GGA and GLL formats) output to other system components
such as a Satellite Modem.
3.6.8.
Other BDE connections
Connect your other Below Decks Equipment (ie, telephone, fax machine and computer equipment) to
complete your configuration.
3.7.
Final Checks
3.7.1.
Visual/Electrical inspection
Do a visual inspection of your work to assure that everything is connected properly and all cables/wires are
secured.
3.7.2.
Electrical - Double check wiring connections
Double check all your connections to assure that it is safe to energize the equipment.
3.8.
Power-Up
Verify that all shipping straps and restrains have been removed prior to energizing the antenna.
When all equipment has been installed, turn ACU Power and Antenna power ON. The ACU will initially sequentially
display:
“SEA TEL – MASTER and DAC-2202 VER 6.xx” followed by,
“SEA TEL – RCVR and SCPC VER 5.xx” followed by,
“SEA TEL – IO MOD and COMMIF VER 1.xx” followed by,
“SEA TEL – REMOTE and INITIALIZING”. After initialization, the bottom line of the remote display will display
the antenna model number and the software version from the PCU.
Содержание 9711-92
Страница 3: ......
Страница 10: ...Table of Contents x 22 2 9711 GENERAL DRAWINGS 22 1 This Page Intentionally Left Blank ...
Страница 22: ...Site Survey 9711 92 Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Страница 62: ...Basic Setup of the ACU 9711 92 Ku Band TXRX 4 4 This Page Intentionally Left Blank ...
Страница 64: ...Setup Ships Gyro Compass 9711 92 Ku Band TXRX 5 2 This Page Intentionally Left Blank ...
Страница 66: ...Setup Band Select 9711 92 Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Страница 72: ...Setup Home Flag Offset 9711 92 Ku Band TXRX 8 4 This Page Intentionally Left Blank ...
Страница 80: ...Setup Searching 9711 92 Ku Band TXRX 10 6 This Page Intentionally Left Blank ...
Страница 92: ...Setup Modem Connections Setup and Test 9711 92 Ku Band TXRX 12 8 This Page Intentionally Left Blank ...
Страница 100: ...Antenna Specific Operation 9711 92 Ku Band TXRX 15 4 This Page Intentionally Left Blank ...
Страница 104: ...Functional Testing 9711 92 Ku Band TXRX 16 4 This Page Intentionally Left Blank ...
Страница 120: ...Installation Troubleshooting 9711 92 Ku Band TXRX 17 16 This Page Intentionally Left Blank ...
Страница 142: ...Maintenance 9711 92 Ku Band TXRX 18 22 This Page Intentionally Left Blank ...
Страница 158: ...9711 92 Technical Specifications 9711 92 Ku Band TXRX 21 10 This Page Intentionally Left Blank ...
Страница 160: ...Drawings 9711 92 Ku Band TXRX 22 2 This Page Intentionally Left Blank ...
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 191: ......
Страница 192: ......
Страница 194: ......
Страница 196: ......