34 | 8 4
Figure 4-19 STEP Display Interface
On the STEP display page, in addition to test steps, test mode information, there is also large font
shows the set voltage and current high limit before starting the test. After pressing
【
START
】
to start
the test, the first line of the large font shows the test value of output voltage, the second line shows
the actual measured value of the current, and the third line is time. Test result is shown in the lower
right corner. As shown in Figure 4-19.
Figure 4-20 LIST Display Interface
On the LIST display page, the first column is the test STEP, the second column is the test MODE,
the third column is the VOLT (test set value), the fourth column is the set LIMIT, and the fifth
column is the test results. After pressing
【
START
】
to start the test, the third column shows the
present voltage test value, and the fourth column shows the actual measured current value or
resistance value. As shown in Figure 4-20.
4.5 Test Methods
4.5.1 Offset of the Test Cable / Fixture
1. First remove the DUT from the test cable or fixture and confirm the set test conditions.
2. Press
〖
TEST
〗
to enter the test interface, press F1 offset key, the tester starts to measure the
leakage current of the test cable and display the current and the test value is used as the zero value.
3. After pressing F1 offset key , the DANGER indicator flashes, the voltage output time is 5S (when
the test time is set to be greater than 5S), if the test time is less than 5S, the output voltage is set
according to the set test time.
F1
F2
F3
F4
F5
F6
F1
F2
F3
F4
F5
F6