Operating Manual
VacuMaster
Chapter 5
Operating
J. Schmalz GmbH
Aacher Straße 29
D - 72293 Glatten
Tel +49 +7443 / 2403 - 0
Fax +49 +7443 / 2403 - 259
http://www.schmalz.de
e-mail: [email protected]
BA 30.30.01.00197
Status 03.2013 / Index 00
Page 14 / 18
General positioning of the rails for flexible loads which are longer than the main
rail (Figures 3+4):
3 rails: (Figure 3)
Divide the workpiece in three parts of equal length (
to
).
Position the outer cross-rails so that their suction pads are positioned in the
centre of each of the end parts (
and
).
4 rails: (Figure 4)
Position both outside rails at the ends of the main rail
Divide the workpiece into four parts of equal length (
to
)
Position the inside rails so that the suction pads are the same distance from
the boundary between parts 1 and 2 and between parts 3 and 4.
Figure 3: Example for positioning 3 rails
Figure 4: Example for positioning 4 rails
Wrong !
Correct !
=
=
Main rail
Rails
=
=
=
=
1
2
3
Wrong !
Correct !
3
4
=
=
Axis of symmetry
Axis of symmetry
=
=
=
Main rail
Rails
=
=
2
1