Vacuum Connection
5.4
1. Hose connection
2. Hose clamp
A hose that is suitable for vacuum applications must be connected at the installed hose connection
and secured with a suitable hose clamp. The supply hose must have the same nominal diameter as
the installed connection. The maximum recommended hose length is around 10 meters. A reduction of
the internal hose diameter or the use of longer hoses could impair the functionality of the system.
Vacuum
Once vacuum is applied in a gripper, it immediately begins suction when the cylin-
der is open.
Solenoid Valves
5.5
The solenoid valves control the separating cylinder as well as blow off. The customer is responsible
for the control system. The pin assignments for control of the solenoid valves can be found in the pin
assignment diagram (5.6.1).
For a detailed description of the functional sequence, see chapter 6.2.