![Schmalz FMHD Series Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/schmalz/fmhd-series/fmhd-series_operating-instructions-manual_1212859021.webp)
30.30.01.01648/03
www.schmalz.com
EN | 21
5 Start of Operations and Setup
Start of Operations
5.1
CAUTION
General notes on the start of operations
Risk of injuries
► The system integrator must secure the danger zone.
►
The production system must be stopped in the area where the system is be-
ing set up
►
The system may only be set up at the workplace in accordance with the oper-
ating instructions.
► The system must be disconnected and depressurized during setup.
►
The production system must be secured to prevent activation during setup.
Approach of a moving element to a fixed part/machinery mobili-
ty/moving elements
Body parts could be crushed, sucked in or caught if the area gripper is abrupt-
ly attached to a workpiece or a surface or by moving parts
►
Do not place any body parts between the bottom of the gripper and a surface.
High pressure
Placement/release of compressed air lines
► The system integrator must secure the danger zone.
► Regularly inspect the gripper and perform regular maintenance in order to
detect and replace porous compressed air lines in good time. Replace defec-
tive connectors.
Stored energy/vacuum
Body parts could be crushed, cut, sucked in, caught or sliced if the area grip-
per is abruptly attached to a workpiece or a surface.
►
Do not place any body parts between the bottom of the gripper and a surface.
►
Eyes can be sucked in; do not look into open vacuum openings.
Conductive parts/parts that have become live in an error state/short
circuits
Electric shock
►
Regularly inspect and perform maintenance on the gripper to detect and re-
pair wear or faulty connections in good time.
Moisture
Very wet workpieces can permanently impair the function of the gripper
► Only grip dry workpieces if possible
► Regularly clean and, if necessary, dry the gripper