Operating manual for the VISATRON VN2020
V2.0 12/2021 EN
Page
58
of
106
SCHALLER AUTOMATION
66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O. Box 1280
Industrielle Automationstechnik GmbH & Co. KG
T
el. +49(0)6842-508
-
0
/ Fax -260 / Email: [email protected] /
www.schaller-automation.com
5.
Figure 67: Clean photodiode
6.
Figure 68: Clean sealing surface
Clean the photodiode
.
Clean the sealing surface of the
inspection cover seal
.
7.
Figure 69: New inspection cover seal
8.
Figure 70: Fit the inspection cover
Position a
new seal
for the inspection
cover on the cleaned sealing surface
over the two cylindrical pins.
Place the inspection cover onto the seal.
Tighten the captive screws crosswise and
hand-tight.
ATTENTION!
A new seal must be used for the inspection
cover.
→
Only use the seal from the service box.