Operating manual for the VISATRON VN2020
V2.0 12/2021 EN
Page
32
of
106
SCHALLER AUTOMATION
66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O. Box 1280
Industrielle Automationstechnik GmbH & Co. KG
T
el. +49(0)6842-508
-
0
/ Fax -260 / Email: [email protected] /
www.schaller-automation.com
1.
Figure 23: Connecting unit
2.
Figure 24: Screws with Loctite 243
Remove the yellow protective caps of
the connecting unit and dispose of them.
Apply Loctite 243 to both threads.
3.
Figure 25: Mount the connecting unit
4.
Figure 26: Insert the suction funnel
Mount the connecting unit on the
crankcase.
Insert the suction funnel, starting from
the inside of crankcase, into the
connecting unit. Place the cutting ring
over the pipe. Align the suction funnel
vertically and with the opening of the
funnel pointing towards the engine
floor.
Attention!
Leakage from the siphon blocks. This
impairs monitoring of an engine block.
→
Make sure the cutting ring is aligned
during installation.