3) Attach the power wires from your kit to the
communication and power wires in the gang
box. See the sections of this manual labeled
“Communication Wiring Information”for additional
details, depending on your system.
Wall Mount Installation
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of three inches away
from the ceiling.
4) If you do not wish to attach the housing to the
gang box, proceed to step 5A. Otherwise, go to
step 6.
Ceiling
4” Minimum
2) Run power and communication wiring to the
gang box. See the sections of this manual labeled
“Inputs - System Side” for additional details,
depending on your system.
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 110
volt model, 207-253 volts AC in the 230 volt
model, or Yellow & orange wires for 21.5-26.5
volts AC in the 24 volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.