Double Mount Installation
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave at
least eleven inches between the top of the gang box
and the ceiling. If you are installing the gang box in
the ceiling, leave at least eleven inches between the
gang box and the wall. The box should be installed
level and plumb with the wall and ceiling.
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
4) Attach the mounting plate to the gang box using
only two of the four long, silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
Ceiling
11” Minimum
2) Run power wiring to the gang box. See the
sections of this manual labeled “Inputs - System
Side” for additional details, depending on
your system.
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 110
volt model, 207-253 volts AC in the 230 volt
model, or Yellow & orange wires for 21.5-26.5
volts AC in the 24 volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.