Dual-Faced / Flag Mounted Clock Mechanical Installation
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall. This space is
needed to allow proper clearance when mounting
the clock. The gang box should be installed level
with the wall and ceiling.
3) The mounting pole consists of a detachable
metal mounting plate. The mounting plate detaches
from the mounting pole by unscrewing the two #6-
32x1/2 Phillips round head black screws that come
already screwed on the pole base plate. Set the
screws and pole aside for later.
4) Attach the mounting plate to the gang box using
only two of the four long, silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to mark the locations of the four larger holes at
the outer corners of the base plate as shown in the
image below.
2) Run power and communication wiring to the
gang box. See the sections of this manual labeled
“
” for wiring information,
depending on your system and any optional
accessories needed to be wired to the clock.
11.0” (27.94cm)
Minimum
11.0” (27.94cm)
Minimum
Ceiling
Wall