Fig. 43
Fig. 44
Fig. 45
9-1-10. Removing the cross flow fan motor (Fig.45)
Fig. 46
Fig. 47
9-1-11. Removing the ring of bearing (Fig.46 and Fig.47)
(4)
Widen the auxiliary piping to the extent of 10º to 20º. (Fig.43)
(5) Pull the heat exchanger to the front side to undo the hooks completely, and then lift it. (Fig.44)
Auxiliary piping
Heat exchanger
Bearing
53
Содержание SAP-CRV12AEH
Страница 13: ...3 DIMENSIONAL DATA Indoor Unit SAP KRV9AEH SAP KRV12AEH 770 201 283 548 5 258 5 126 5 770 283 13 ...
Страница 14: ...Outdoor Unit SAP CRV9AEH SAP CRV12AEH 708 658 275 550 317 470 299 14 ...
Страница 67: ...INSTRUCTION MANUAL SAP KRV9AEH SAP CRV9AEH SAP KRV12AEH SAP CRV12AEH OI 852 6 4181 180 00 1 APPENDIX A A 1 ...
Страница 107: ......
Страница 108: ...SANYO Electric Co Ltd Osaka Japan June 2010 Printed in Japan B ...